What Will Winter Break on Your Site This Year?

Construction site at night in winter with a dark stairwell, a wet walkway and a PepTalk kiosk asking a question
Mark Flynn
Mark Flynn
November 17, 2026
4
Min Read

Winter gives plenty of warning

Ask a project director what worries them about winter and the list is familiar. Slips and trips on wet walkways. Work carrying on after dark. Two weeks of shutdown, then a restart with changed routes, idle plant and new faces at the gate. On a data centre build, add a programme that can't afford to lose a week.

The numbers back the worry. Falls, slips and trips caused 412 of the 1,092 construction deaths in the US in 2022. When the Building Safety Group analysed accidents across the 3,200+ UK construction sites it looks after, slip, trip and fall injuries more than doubled from November to January compared with the quarter before.

The people who see it first are on the tools

Winter's hazards don't appear overnight. The stairwell with the broken light, the walkway that floods every time it rains, the store where materials get wet: someone on site walks past each of them every day. By the time one shows up in an incident report, the crew has known about it for weeks.

Most sites have no quick way to hear it. Toolbox talks go one way, safety walks see what one person sees on one day, and incident data arrives after the fact.

What leading sites are asking

PepTalk customers use Spotchecks: one short question, answered anonymously on the site kiosk or by QR code in under a minute, with results the same day. Ahead of winter they ask questions that put a location or a name on the risk. A few they've run:

  • Where is lighting poorest on site?
  • What needs most attention before the Christmas shutdown?
  • When routes change, how do you find out?
  • Was your first piece of work checked before you carried on?

Crews answer with practical fixes. Last winter, when sites asked what would help most with winter readiness, nearly two in three answers named clear walkways, better lighting or grit. Slip, trip and visibility fixes came first.

Each answer is something a site manager can act on that afternoon: a light fitting, a grit run, a clearer briefing, a check before work carries on.

Start before the dark sets in

The best time to ask is now, while there's still time to order lighting and grit, plan the shutdown and set up the restart. We've put twelve of these questions into a free winter readiness guide, with a set for each stage from the clocks going back through to February, plus the answer options and what to look for in the results.

Get the free winter readiness guide

Sources

  1. US Bureau of Labor Statistics, "A look at falls, slips, and trips in the construction industry" (2022 data, published May 2024): bls.gov
  2. Building Safety Group accident analysis, reported by The Construction Index, February 2013: theconstructionindex.co.uk
  3. PepTalk Spotcheck responses from construction sites, October to December 2025, anonymised and aggregated.

Prepared by: Mark Flynn
Head of Product, PepTalk